Skip to main content
Advanced Search
Search Terms
Content Type

Exact Matches
Tag Searches
Date Options
Updated after
Updated before
Created after
Created before

Search Results

285 total results found

Overview

🇬🇧 eEKAS User Guide - EN Share and Target Management

eEKAS is a next-generation, Ceph-based storage operating system designed for modern enterprise and cloud-native environments. Built to deliver scalability, performance, and high availability, eEKAS provides unified file, block, and object storage within a sing...

Übersicht

🇩🇪 eEKAS Handbuch - DE Freigaben und Targets

eEKAS ist ein Storage-Betriebssystem der nächsten Generation auf Basis von Ceph, das für moderne Enterprise- und Cloud-native Umgebungen entwickelt wurde. Es bietet Skalierbarkeit, hohe Performance und Hochverfügbarkeit und vereint Datei-, Block- und Objektspe...

OSD in einem Ceph Cluster verstehen

🇩🇪 eEKAS Handbuch - DE Cluster-Laufwerksverwaltung

In einem Ceph-Cluster ist ein OSD (Object Storage Daemon) der Prozess, der für die Speicherung von Daten auf einer physischen Festplatte verantwortlich ist. Jeder OSD verwaltet ein einzelnes Storage-Gerät und übernimmt Aufgaben wie Datenreplikation, Löschcodi...

Ceph Storage Calculator

🇬🇧 eEKAS User Guide - EN

This tool helps you estimate usable capacity and fault tolerance for a Ceph cluster based on your hardware configuration — whether you are planning an eEVOS virtualisation platform, an eEKAS storage deployment, or a custom Ceph architecture. Enter: Num...

WAL/DB Configuration in eEKAS (Ceph OSD Optimization)

🇬🇧 eEKAS User Guide - EN

Overview In eEKAS, WAL (Write-Ahead Log) and DB (RocksDB metadata) are critical components of Ceph OSDs (Object Storage Daemons). They are used to optimize write performance and metadata handling within the storage cluster. By default, these components can r...

WAL/DB Konfiguration in eEKAS (Ceph OSD Optimierung)

🇩🇪 eEKAS Handbuch - DE

Übersicht In eEKAS sind WAL (Write-Ahead Log) und DB (RocksDB Metadaten) zentrale Komponenten der Ceph OSDs (Object Storage Daemons). Sie dienen der Optimierung von Schreibvorgängen sowie der effizienten Verarbeitung von Metadaten im Storage-Cluster. Standar...

Introduction

euroNAS Premium Plus installation Guide

This guide provides an overview of euronas Premium Plus and how to deploy the system. euronas Premium Plus is a software-defined storage platform designed to deliver flexible, high-performance storage on standard x86 server hardware, supporting both Intel and ...

Prerequisites

euroNAS Premium Plus installation Guide

Before starting the installation, it is assumed that the underlying infrastructure and access to the server are already in place and working. Access to the server should be available via a remote management interface (e.g. iLO, iDRAC or equivalent), or direct ...

Install OS onto the dedicated OS Drive

euroNAS Premium Plus installation Guide Base Installation

As outlined earlier, the euronas Premium Plus operating system is installed from a dedicated ISO image. When the system boots correctly from the ISO, you will be presented with the initial installation screen.  Press Enter to begin the installatio...

Select Language

euroNAS Premium Plus installation Guide Base Installation

Once the system has fully loaded, you will be presented with the option to install the euronas Premium Plus operating system in either English or German.

License

euroNAS Premium Plus installation Guide Base Installation

Before installing the euronas Premium Plus operating system, you will be required to accept the license agreement. A full copy of the license terms is available on request via support@euronas.com.To proceed with the installation, press Enter to accept the ...

Operating System Disk Selection

euroNAS Premium Plus installation Guide Base Installation

  In this example, two drives are visible. The dedicated OS drive is vda (256,000 MB / 256 GB), as referenced earlier. This drive will be selected for the installation. The second drive (vdb) is intended for data and should not be selected as part of the op...

Final Confirmation and Disk Formatting

euroNAS Premium Plus installation Guide Base Installation

This is the final confirmation before the selected drive is formatted.Selecting Yes and pressing Enter will permanently erase all data on the selected drive and proceed with the installation of the euroNAS Premium Plus operating system. This action cannot...

Installation Progress and Completion

euroNAS Premium Plus installation Guide Base Installation

The system may take a short period of time to install euroNAS Premium Plus onto the system disk. Once the progress counter reaches 100%, the base installation is complete. Please note that the progress counter may pause at certain stages this is expected ...

Post-Installation Boot Configuration

euroNAS Premium Plus installation Guide Base Installation

The base installation is now complete. Ensure the ISO image is no longer mounted and that the server is configured to boot from the system disk. Failure to do so may result in the system repeatedly booting back into the installation process.

Initial Boot and Network Configuration

euroNAS Premium Plus installation Guide Base Installation

Once the system has booted, you will be presented with the console prompt screen. If DHCP is enabled, the system will have assigned an IP address to one of the network interfaces. In this example, the assigned address is 192.168.1.45.At this stage, you hav...

1st Time Login

euroNAS Premium Plus installation Guide Base Installation

At the user prompt, enter admin (lower case) and press Enter. At the password prompt, enter euronas (lower case) and press Enter.

Management Network Configuration

euroNAS Premium Plus installation Guide Base Installation

Once you have successfully logged in, you will be presented with the operating system management screen. Scroll down to option T Network settings and press Enter Select the network controller you wish to configure for the management interface. In thi...

Storage and Service Configuration

euroNAS Premium Plus installation Guide System Configuration via GUI

The base system is now configured.  In this section, we will create the storage server instance, show how to upgrade the server code base, and configure the necessary storage and network services, including SMB shares, iSCSI targets, and NVMe over TCP, to del...

Accessing the GUI

euroNAS Premium Plus installation Guide System Configuration via GUI

Using HTTPS, connect to the management IP address. In this example, the address is https://192.168.1.185/. You will be presented with the main login screen. As previously noted, the default credentials are: • Username: admin • Password: euronas ...